When planning to install a new air conditioning unit in Bath, one of the most common concerns is how long the installation process will take. Knowing what to expect can help you plan accordingly and minimise any disruption to your daily routine. Here’s a breakdown of the typical installation timeline for an air conditioning unit.

Pre-Installation Assessment

Before the actual installation, a pre-installation assessment is conducted. This involves a technician visiting your property to evaluate your specific needs, measure the space, and determine the best location for the unit. This assessment usually takes a few hours, depending on the complexity of the installation.

Installation Day

The installation process itself generally takes between 4 to 8 hours for a standard air conditioning system. However, several factors can influence the duration:

  1. Type of System: The complexity of the system being installed (e.g., split systems, ducted systems, multi-split systems) affects the installation time. More complex systems may require additional time for setup and testing.
  2. Location: The accessibility and location of the indoor and outdoor units can impact installation time. Difficult-to-reach areas or multiple floors may extend the duration.
  3. Existing Infrastructure: If there is existing ductwork or wiring in place, the process can be quicker. New installations that require additional electrical work or ducting will take longer.
  4. Weather Conditions: External weather conditions can affect the speed of installation, particularly for outdoor units. Adverse weather might delay the process slightly.
  5. Number of Technicians: The size of the installation team can influence how quickly the work is completed. More technicians on the job usually mean a faster installation.

Post-Installation

After the unit is installed, the technicians will test the system to ensure it’s functioning correctly and efficiently. They will check for leaks, ensure the thermostat is working properly, and demonstrate how to use the system. This final stage can take an additional 1 to 2 hours.

Conclusion

In summary, while the actual installation of an air conditioning unit typically takes between 4 to 8 hours, the entire process, including the pre-installation assessment and post-installation checks, can span a couple of days. Planning ahead and consulting with professional installers can help streamline the process and ensure a smooth installation experience.

If you’re looking to get air conditioning installed in Bristol, Bath or the surrounding areas of Sommerset please get in touch for more details or a quote.